|
To gain the Certificate III in Plumbing you must successfully complete the following. |
|
Subject |
|
Course No |
|
Title |
|
Nat/State |
|
Core (complete all) |
|
Stage 1: |
|
|
|
|
|
OHSS |
|
436 |
|
Work safely in the construction industry |
|
CPCCOHS1001A |
|
OHSS |
|
249 |
|
Apply OHS requirements, policies and procedures in the construction industry |
|
CPCCOHS2001A |
|
CNST |
|
565 |
|
Work safely at heights |
|
CPCCCM2010A |
|
COMM |
|
340 |
|
Carry out interactive workplace communication |
|
CPCPCM2002A |
|
PLMB |
|
132 |
|
Read plans and calculate plumbing quantities |
|
CPCPCM2004A |
|
OHSS |
|
247 |
|
Apply first aid in the workplace |
|
CPCPCM2011A |
|
OHSS |
|
507 |
|
PlumbCarry out OHS requirements |
|
CPCPCM2023A |
|
PLMB |
|
362 |
|
Handle and store plumbing materials |
|
CPCPCM2025A |
|
PLMB |
|
363 |
|
Use plumbing hand and power tools |
|
CPCPCM2026A |
|
PLMB |
|
365 |
|
Mark out materials |
|
CPCPCM2030A |
|
PLMB |
|
380 |
|
Weld using oxy-acetylene equipment |
|
CPCPCM2032A |
|
PLMB |
|
381 |
|
Weld using arc welding equipment |
|
CPCPCM2033A |
|
PLMB |
|
382 |
|
Work safely on roofs |
|
CPCPCM2035A |
|
PLMB |
|
385 |
|
Fabricate and install non-ferrous pressure piping |
|
CPCPCM3013A |
|
PLMB |
|
389 |
|
Connect and install storage tanks to a domestic water supply |
|
CPCPWT3010A |
|
PLMB |
|
390 |
|
Set out and install water services |
|
CPCPWT3011A |
|
PLMB |
|
391 |
|
DrInstall and adjust water service controls and devices |
|
CPCPWT3012A |
|
PLMB |
|
392 |
|
Install and commission water heating systems |
|
CPCPWT3013A |
|
PLMB |
|
394 |
|
Install water pump sets |
|
CPCPWT3015A |
|
PLMB |
|
378 |
|
Cut and join sheet metal |
|
CPCPCM2028A |
|
PLMB |
|
379 |
|
Cut using oxy-LPG-acetylene equipment |
|
CPCPCM2029A |
|
CNST |
|
406 |
|
Erect and dismantle restricted height scaffolding |
|
CPCCCM2008A |
|
CNST |
|
404 |
|
Carry out load slinging of off-site materials |
|
CPCCST2005A |
|
CNST |
|
189 |
|
Operate elevated work platforms |
|
CPCCCM3001B |
|
PLMB |
|
393 |
|
Install and maintain domestic water treatment equipment |
|
CPCPWT3014A |
|
Stage 2: |
|
|
|
|
|
PLMB |
|
364 |
|
Carry out levelling |
|
CPCPCM2027A |
|
PLMB |
|
366 |
|
Carry out simple concreting and rendering |
|
CPCPCM2034A |
|
PLMB |
|
455 |
|
Fabricate and install fire hydrant and hose reel systems |
|
CPCPFS3011A |
|
PLMB |
|
430 |
|
Install domestic and residential life safety sprinkler systems |
|
CPCPFS3017A |
|
PLMB |
|
445 |
|
Set out, install and commission irrigation systems |
|
CPCPIG3011A |
|
PLMB |
|
444 |
|
Design domestic urban irrigation systems |
|
CPCPIG2011A |
|
PLMB |
|
396 |
|
Plan layout of a residential sanitary plumbing system |
|
CPCPSN3011A |
|
PLMB |
|
397 |
|
Install discharge pipes |
|
CPCPSN3012A |
|
PLMB |
|
398 |
|
Fabricate and install sanitary stacks |
|
CPCPSN3013A |
|
PLMB |
|
399 |
|
Install and fit off sanitary fixtures |
|
CPCPSN3014A |
|
PLMB |
|
395 |
|
Fit off and commission heated and cold water services |
|
CPCPWT3016A |
|
PLMB |
|
432 |
|
Connect irrigation systems from drinking water supply |
|
CPCPWT3017A |
|
PLMB |
|
433 |
|
Install water service |
|
CPCPWT3018A |
|
PLMB |
|
384 |
|
Weld plastic pipe using fusion method |
|
CPCPCM3012A |
|
PLMB |
|
439 |
|
Install sewerage pump sets |
|
CPCPSN3016A |
|
PLMB |
|
367 |
|
Locate and clear blockages |
|
CPCPDR2011A |
|
PLMB |
|
368 |
|
Install domestic treatment plants |
|
CPCPDR2012A |
|
PLMB |
|
370 |
|
Install stormwater and sub-soil drainage systems |
|
CPCPDR2014A |
|
PLMB |
|
371 |
|
Drain work site |
|
CPCPDR2015A |
|
PLMB |
|
372 |
|
Install prefabricated inspection openings and enclosures |
|
CPCPDR2016A |
|
PLMB |
|
373 |
|
Plan layout of a residential sanitary drainage system |
|
CPCPDR3011A |
|
PLMB |
|
374 |
|
Install below ground sanitary drainage systems |
|
CPCPDR3012A |
|
PLMB |
|
375 |
|
Install on-site disposal systems |
|
CPCPDR3013A |
|
CNST |
|
405 |
|
Install trench support |
|
RIICCM210A |
|
PLMB |
|
369 |
|
Maintain effluent disinfection systems |
|
CPCPDR2013A |
|
PLMB |
|
438 |
|
Install pre-treatment facilities |
|
CPCPSN3015A |
| Stage 3: |
|
|
|
|
|
PLMB |
|
361 |
|
Work effectively in the plumbing and services sector |
|
CPCPCM2021A |
|
PLMB |
|
383 |
|
Flash penetrations through roofs and walls |
|
CPCPCM3011A |
|
PLMB |
|
404 |
|
Select and install roof sheeting and wall cladding |
|
CPCPRF2012A |
|
PLMB |
|
405 |
|
Collect and store roof water |
|
CPCPRF2013A |
|
PLMB |
|
407 |
|
Receive roofing materials |
|
CPCPRF3011A |
|
PLMB |
|
408 |
|
Fabricate and install roof drainage components |
|
CPCPRF3012A |
|
PLMB |
|
409 |
|
Fabricate and install external flashings |
|
CPCPRF3013A |
|
PLMB |
|
410 |
|
Install roof components |
|
CPCPRF3014A |
|
PLMB |
|
412 |
|
Install composite roof systems |
|
CPCPRF3016A |
|
PLMB |
|
406 |
|
Fabricate roof coverings for curved structures |
|
CPCPRF2014A |
|
PLMB |
|
411 |
|
Install roof coverings to curved roof structures |
|
CPCPRF3015A |
|
PLMB |
|
414 |
|
Install LPG systems in caravans, mobile homes, water craft and mobile workplaces |
|
CPCPGS3016A |
|
PLMB |
|
415 |
|
Install gas detection devices |
|
CPCPGS3017A |
|
PLMB |
|
416 |
|
Install gas pressure control equipment |
|
CPCPGS3018A |
|
PLMB |
|
417 |
|
Install Type A gas appliance flues |
|
CPCPGS3019A |
|
PLMB |
|
419 |
|
Purge consumer piping |
|
CPCPGS3021A |
|
PLMB |
|
421 |
|
Disconnect and reconnect Type A gas appliances |
|
CPCPGS3023A |
|
PLMB |
|
422 |
|
Calculate and install natural ventilation for Type A gas appliances |
|
CPCPGS3024A |
|
PLMB |
|
424 |
|
Install gas piping systems |
|
CPCPGS3031A |
|
PLMB |
|
425 |
|
Size consumer gas piping systems |
|
CPCPGS3032A |
|
PLMB |
|
426 |
|
Install and commission Type A gas appliances |
|
CPCPGS3033A |
|
PLMB |
|
427 |
|
Install LPG storage of aggregate storage capacity up to 500 litres |
|
CPCPGS3034A |
|
PLMB |
|
420 |
|
Maintain Type A gas appliances |
|
CPCPGS3022A |
|
Mechanical Services specialisation stream: (These units may be delivered in either Stage 2 or Stage 3 depending on demand) |
|
ENGR |
|
127 |
|
Interpret technical drawing |
|
MEM09002B |
|
ENGR |
|
201 |
|
Perform engineering measurements |
|
MEM12023A |
|
ENGR |
|
143 |
|
Use hand tools |
|
MEM18001C |
|
ENGR |
|
145 |
|
Use power tools/hand held operations |
|
MEM18002B |
|
PLMB |
|
400 |
|
Assemble mechanical services components |
|
CPCPMS2011A |
|
PLMB |
|
401 |
|
Fabricate and install steel pressure piping |
|
CPCPMS3011A |
|
PLMB |
|
403 |
|
Install small bore heating systems |
|
CPCPMS3013A |
|
PLMB |
|
317 |
|
Install pipework and pipework assemblies |
|
MEM10010B |
|
PLMB |
|
447 |
|
Install medical gas pipeline systems |
|
CPCPMS3014A |
|
PLMB |
|
448 |
|
Install and test ducting systems |
|
CPCPMS3015A |
|
PLMB |
|
452 |
|
Maintain mechanical services equipment |
|
CPCPMS3019A |
|
PLMB |
|
402 |
|
Select and fit insulation and sheathing |
|
CPCPMS3012A |
|
PLMB |
|
449 |
|
Install air handling units |
|
CPCPMS3016A |
|
PLMB |
|
451 |
|
Install air conditioning control equipment |
|
CPCPMS3018A |
|
|
|
|
|
|
|
|